Search : Electronic And Electrical Testing, Safety Testing, Environmental Monitoring

Environmental Science Popularization | 22 Common Projects Not included in Environmental Impact Assessment Management


Time:

2024-04-19

Environmental Science Popularization | 22 Common Projects Not included in Environmental Impact Assessment Management

1、 Excluding non solvent low VOCs content coatings with an annual usage of less than 10 tons in the directory:
Projects with only coating technology and annual use of non solvent low VOCs content coatings of less than 10 tons are not included in environmental impact assessment management.

2、 Excluding those that are only divided, welded, or assembled in the directory:
Projects that only involve mechanical processing are not included in environmental impact assessment management.

3、 List of winning projects with "*":
Only referring to construction projects produced in industrial buildings, household workshops and commercial stores are not included in the environmental impact assessment management.

4、 River sand mining project:
According to the directory regulations, river sand mining is not included in environmental impact assessment management.

5、 Tobacco manufacturing projects:
The projects related to "161 Tobacco Redrying" and "169 Other Tobacco Product Manufacturing" in the National Economic Industry Classification are not specified in the directory and are not included in the environmental impact assessment management.

6、 Liquid hydrogen production project:
According to the National Economic Industry Classification "2619" Manufacturing of Other Basic Chemical Raw Materials ", projects that produce liquid hydrogen by compressing and cooling hydrogen gas are not included in the environmental impact assessment management if they do not produce wastewater or volatile organic compounds. According to the relevant provisions of" 44 Manufacturing of Basic Chemical Raw Materials 261; Manufacturing of Pesticides 263; Manufacturing of Coatings, Inks, Pigments and Similar Products 264; Manufacturing of Synthetic Materials 265; Manufacturing of Special Chemical Products 266; Manufacturing of Explosives, Pyrotechnics and Fireworks 267 ".

7、 Daily chemical product manufacturing projects that generate pollutants such as VOCs and wastewater:
The daily chemical product manufacturing projects that generate pollutants such as VOCs and wastewater shall be classified according to the relevant provisions of the "46 Daily Chemical Product Manufacturing 268" list, combined with the production process and product type of daily chemical products, to determine the environmental impact assessment category. Items not specified in the list shall not be included in the environmental impact assessment management.

8、 Sanitary fragrance manufacturing project:
In the "Classification of National Economic Industries" (2689) "Manufacturing of Other Daily Chemical Products", the main processes include mixing, stirring, extrusion, and drying, and hygiene fragrance manufacturing projects that do not involve chemical reactions are not specified in the list and are not included in environmental impact assessment management.

9、 Daily glass manufacturing project:
According to the relevant regulations of "57 Glass Manufacturing 304; Glass Product Manufacturing 305" in the "National Economic Industry Classification", the daily glass manufacturing project that uses electric melting furnace production is not included in the environmental impact assessment management, and those that only cut, polish, and shape are not included in the environmental impact assessment management.

10、 Ceramic product manufacturing project:
The projects listed in the National Economic Industry Classification, such as 3073 Manufacturing of Special Ceramic Products, 3075 Manufacturing of Decorative Art Ceramics, 3076 Manufacturing of Horticultural Ceramics, and 3079 Manufacturing of Other Ceramic Products, which do not use high polluting fuels, are not specified in the list and are not included in environmental impact assessment management.

11、 Metal cold drawn wire project:
According to the National Economic Industry Classification "3340 Manufacturing of Metal Wire Ropes and Their Products", metal cold drawing projects that change the metal diameter at room temperature and do not involve the heating process are not included in the environmental impact assessment management according to the relevant provisions of the list "66 Manufacturing of Metal Wire Ropes and Their Products 334".

12、 Metal surface treatment and heat treatment processing projects:
For the category of "67 Metal Surface Treatment and Heat Treatment Processing" in the directory, which involves surface treatments such as sandblasting, shot blasting, water washing for oil removal, phosphating, acid washing, etc., an environmental impact report form should be prepared. Powder and plastic spraying projects, such as non solvent low VOCs content coatings with an annual usage of less than 10 tons, are not included in the environmental impact assessment management.

13、 Packaging projects for waste plastics and other materials:
For the crushing and packaging projects of waste plastic bottles and other materials that do not involve water washing technology, according to the relevant provisions of the directory "85 Metal Waste and Debris Processing Treatment 421; Non Metal Waste and Debris Processing Treatment 422 (421 and 422 do not include materials that are hazardous waste and only sorting and crushing)", they are not included in the environmental impact assessment management.

14、 Disposable medical infusion bag (bottle) recycling project:
According to the Notice on Clarifying the Classification of Medical Waste issued by the Ministry of Health (Health Office Medical Document [2005] No. 292), "Various types of glass (disposable plastic bags) infusion bottles (bags) that have not been contaminated by patient blood, body fluids, or excreta after use are not considered medical waste." In addition, combined with the National Catalogue of Hazardous Wastes (2021 Edition), the sorting, compression, and packaging of disposable medical infusion bags (bottles) that meet the above regulations and do not belong to hazardous waste are not included in the list. According to the list, "85 metal waste and debris processing 421; non-metal waste and debris processing 422 (421 and 422 do not include materials that are hazardous waste, but only sorting and crushing are not included." The relevant regulations are not included in the environmental impact assessment management.

15、 Sewage treatment station upgrading and renovation project:
The process renovation project of the enterprise's own sewage treatment station, where all treated effluent is reused without discharge, is not included in the environmental impact assessment management according to the provisions of "Other (excluding upgrading renovation projects; excluding septic tanks and reclaimed water treatment and reuse after septic tank treatment; excluding those that only construct sedimentation tanks for treatment)" in the "95 Sewage Treatment and Recycling" directory.

16、 Centralized washing projects for hotels, restaurants, medical institutions, and other clothing:
The directory does not specify the centralized washing and disinfection of clothing and tableware in hotels, restaurants, and medical institutions, and is not included in the environmental impact assessment management.

17、 Laboratory projects:
Professional technical services such as quality testing, environmental monitoring, and food inspection in the National Economic Industry Classification are not included in environmental impact assessment management. If such services rely on the construction of laboratories and do not generate experimental waste gas, wastewater, or hazardous waste, they will not be included in the environmental impact assessment management.

18、 The closure project of the landfill site:
The environmental impact assessment of landfill projects generally includes the relevant content of site closure after the service period expires. For individual landfill site closure projects, the list is not specified and they are not included in the environmental impact assessment management.

19、 Domestic waste disposal and renovation project:
The renovation projects under the category of "other disposal methods" in the "106 centralized disposal of household waste (including food and kitchen waste) (excluding household waste power generation)" list, which do not involve additional disposal capacity, will not be included in the environmental impact assessment management.


20、 Rehabilitation medical projects:
The construction projects for rehabilitation services for individuals with intellectual disabilities, mental illnesses, drug use, alcohol abuse, and other illnesses mainly treated in the "8499 Other Health Services Not Listed in the National Economic Industry Classification" are not specified in the directory and are not included in the environmental impact assessment management.


21、 Fire Station Project:
The list is not specified and will not be included in environmental impact assessment management.

22、 Liquefied petroleum gas packaging project:
The liquefied petroleum gas packaging project, which is not specified in the list, is not included in the environmental impact assessment management.
 

手机官网
手机官网

Wechat Public

Account