Services: Electrical testing and certification, environmental or chemical testing

Implemented on July 1st! New national standard "Technical Specification for Quality Verification of Pollutant Discharge Permits" HJ 1299-2023


Time:

2023-06-30

The Technical Specification for Quality Verification of Pollution Discharge Permits (HJ1299-2023) will be implemented from July 1, 2023.

To implement the Environmental Protection Law of the China, the Law of the China on the Prevention and Control of Air Pollution, the Law of the China on the Prevention and Control of Water Pollution, the Law of the China on the Prevention and Control of Soil Pollution, the Law of the China on the Prevention and Control of Environmental Pollution by Solid Wastes, the Law of the China on the Prevention and Control of Noise Pollution, the Marine Environmental Protection Law of the China, and the Yangtze River Protection Law of the People's Republic of China The Regulations on the Administration of Pollutant Discharge Permits and other laws and regulations have been established to improve the technical support system for pollutant discharge permits and guide the quality inspection of pollutant discharge permits. The Technical Specifications for Quality Inspection of Pollutant Discharge Permits have been approved as a national ecological environment standard and are hereby issued.
The standard name and number are as follows: "Technical Specification for Quality Verification of Pollutant Discharge Permits" (HJ1299-2023), which will be implemented from July 1, 2023.
The Ministry of Ecology and Environment has issued for the first time the "Technical Specification for Quality Verification of Pollutant Discharge Permits", which stipulates the methods and requirements for conducting quality verification of pollutant discharge permits, the preparation work for verification, and the main verification content.

 

01. Verification method

The basic methods for verifying the quality of pollution discharge permits include data basis verification, off-site verification, and on-site verification.

 

02. Verification requirements

Integrity, standardization, consistency and timeliness.

 

03. Preparation for verification

Collect verification data, verify issuance basis, and prepare verification equipment.

 

04. Main contents of verification

The quality verification of pollution discharge permits can be carried out through a combination of off-site verification and on-site verification.
The off-site verification focuses on whether the recorded content of the pollution discharge permit is completed in accordance with the requirements of the technical specifications for the application and issuance of the pollution discharge permit, and whether the recorded content is consistent with the requirements of relevant documents such as laws and regulations, pollutant discharge standards, pollution discharge permit application and issuance technical specifications, and self monitoring technical guidelines, Is the recorded content consistent with the environmental impact report (form) and its approval documents, or the completion environmental protection acceptance documents and acceptance opinions.
On site verification mainly involves verifying the consistency between the content recorded in the pollutant discharge permit and the actual situation of the pollutant discharge unit, and further determining any doubts raised during non on-site verification.

手机官网
手机官网

Wechat Public

Account